Nord-Pas-de-Calais
An attractive, well-drained and durable soil to enhance the appearance of your tree.
The client wanted to create an attractive and durable tree surround, while ensuring effective drainage around the trunk.
The intervention began with the precise demarcation of the perimeter around the tree, followed by the excavation and removal of existing materials in order to create a sound foundation. The substrate was then carefully adjusted, levelled and compacted to ensure perfect stability over time. A drainage foundation was installed across the entire surface, allowing for optimal water circulation and preventing any stagnation at the base of the tree.
The drainage resin was then carefully applied, combining two shades of beige for the outline and burgundy purple to create an aesthetic and structuring contrast. The coating was pulled and smoothed with precision to ensure a uniform, resistant and perfectly permeable surface.
Finally, the central reservation was finished with decorative pebbles and integrated lighting, providing an elegant finish that highlights the tree while maintaining the drainage performance of the installation.
Uniform, non-slip surface
Natural water drainage
High UV resistance
High-end finish
Discover other outdoor projects
Customer satisfaction is our greatest reward. It reflects our commitment to delivering flawless projects, meeting deadlines, and maintaining a relationship of trust at every stage of the project.
Enhance your trees with a drainage resin border that combines aesthetics with respect for nature. This solution creates an elegant and stable surface around the trunk while allowing water and air to circulate naturally to the roots. No more tedious weeding and exposed roots: the resin forms a clean, safe space that enhances your trees. Quick installation in a single day for a durable, maintenance-free result that immediately transforms your garden.
BEFORE
AFTER
Location
Nouvelle-Aquitaine
Coating
Drainage resin
Colors
Beige / Burgundy Violin
Thickness
4 centimetres
Surface
Approximately 12 m²
Duration of the project
1 day